Los Angeles Depar...
Home
Discussions
Forums
Meetings
Surveys
Sign In
Sign Up
×
Sign In
Email
Forgot your password?
Password
or, Sign In with:
Connect
Los Angeles Department of Water and Power
Meeting:
Board of Commissioners
Meeting Time: September 24, 2019 at 10:00am PDT
Closed for Comment September 23, 2019 at 6:00pm PDT
The online Comment window has expired
Agenda Items
Select an Agenda Item to Comment on.
12. (Recommended by Chief Financial Officer) (Approved by General Manager and Chief Engineer) Approval of Payment of Premiums for Corporate Property Insurance Policy November 1, 2019, Through November 1, 2020. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(2).
13. (Recommended by General Counsel Water and Power) (Approved by General Manager and Chief Engineer) Approval of Proposed Professional Services Agreement No. 47575-0 between the City of Los Angeles, acting by and through the Department of Water and Power, and Nossaman LLP for a term of three years and an initial allocation of $700,000. Determine item is exempt pursuant to CEQA Guidelines Section 15061(b)(3).
14. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services and Chief Financial Officer) (Approved by General Manager and Chief Engineer) Approval of Agreement for Renewable Energy Resource Reference Rate Between the Regents of the University of California Acting by and through its Los Angeles Campus and the Los Angeles Department of Water and Power. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
15. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Reliability Coordinator Services Agreement Between the California Independent System Operator Corporation (CAISO) and Los Angeles Department of Water and Power. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3). City Council approval is required.
16. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Amendment No. 1 to Contract No. 494 for Transformers, Subsurface, Single-Phase with Power Partners, Inc. The Amendment will extend the term by two additional one-year renewal periods and increase the cumulative amount by $12,252,362. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
17. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Amendment No. 1 to Contract No. 654 for Single-Phase Power Transformers for Various Distributing Stations with Powermax Company Ltd. The Amendment will extend the term by two years and increase the cumulative amount by $3,995,999. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
18. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Amendment No. 1 to Contract No. 760 for Services for Installing, Removing, and Splicing Underground Distribution System Cables with Edison Power Constructors, Inc. The Amendment will extend the term by two additional one-year renewal periods and increase the cumulative amount by $68,763,968. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
19. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Barren Ridge – Haskell Line 1 Upgrade Project Ordinance Requesting the Los Angeles City Council to Establish Design-Build Criteria Pursuant to Section 371(b) of the City Charter. In accordance with CEQA and the National Environmental Policy Act, LADWP along with its federal co-lead agencies, the United States Forest Service and Bureau of Land Management, prepared a joint Environmental Impact Statement/Environmental Impact Report to evaluate and disclose the potential environmental impact associated with the construction and operation of the Barren Ridge Renewable Transmission Project. City Council approval is required.
20. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Amendment No. 1 to Agreement No. 47481 for 100 Percent Renewable Energy Study with Alliance for Sustainable Energy, LLC. The Amendment will extend the term by two years and increase the amount by $4,043,810. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(2).
21. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Agreement No. 47565 for Energy Imbalance Market Merchant and Entity Settlement and Transmission Billing Systems. Award to Power Settlements Consulting and Software, LLC, for a term of three years and an amount not to exceed $2,898,430. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(2).
22. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Clean Grid LA: 300 Megawatt Feed-in Tariff Program Expansion. Determine item is exempt pursuant to CEQA Guidelines Section 15061(b)(3). City Council approval is required.
23. (Recommended by Senior Assistant General Manager – Water System) (Approved by General Manager and Chief Engineer) Approval of Contract No. 107 for Bare Rental, Trench Shoring, Traffic Plates, Traffic Control Equipment with Trench Plate Rental Company for a term of one year with four optional one-year periods and an amount not to exceed $35,692,025. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
24. (Recommended by Senior Assistant General Manager – Water System) (Approved by General Manager and Chief Engineer) Approval of Project Labor Agreement for the San Fernando Groundwater Basin Remediation Project. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).
25. (Recommended by Senior Assistant General Manager – Water System) (Approved by General Manager and Chief Engineer) Approval of Purchase and Authorization to Accept a Non-Exclusive Subsurface Water Pipeline Easement from the Los Angeles County Metropolitan Transit Authority LADWP File No. W-36902. Determine item is in compliance with CEQA Guidelines Sections 15080-15097 (Environmental Impact Report previously adopted).
26. (Recommended by Senior Assistant General Manager – Water System) (Approved by General Manager and Chief Engineer) Approval of Residential Purchase Agreement and Joint Escrow Instructions for the Purchase of Real Property Located at 1728 Shoshone Drive, Bishop, California. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(2).
« First
‹ Prev
1
2
3
4
Next ›
Last »
Sign Up
Connect