13. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services)
(Approved by General Manager and Chief Engineer)
Approval of Los Angeles Department of Water and Power Interconnection Expenditure Recovery Charges – Photovoltaic and/or Battery Energy Storage System.
Determine item is in compliance with CEQA Guidelines Section 15060(c)(3).