Meeting Time: December 10, 2019 at 10:00am PST
The online Comment window has expired

Agenda Item

17. (Recommended by Senior Assistant General Manager – Power System Engineering, Planning, and Technical Services) (Approved by General Manager and Chief Engineer) Approval of Amendment No. 1 to Contract No. 589 for 34.5-kV Fuse Assemblies, Metal-Enclosed Switchgear, Modular Style Metal-Enclosed Switchgear, and Air Insulated Switch/Fuse Units with Electro-Mechanical Corporation dba Federal Pacific/Line Power. The Amendment will extend the term by two additional one-year renewal periods and increase the amount by $5,407,560. Determine item is exempt pursuant to CEQA Guidelines Section 15060(c)(3).